Module 2 | Session 2: Water Quality and ...
The materials in this session cover water quality control activities, maintenance and calibration of production equipment, and water quality control activities. Areas covered are the purpose of assuring water quality as a prerequisite of the FSMS, chlorination procedures, chlorine testing, corrective actions and record keeping, maintenance and calibration of production equipment, procedure for calibrating thermometers and scales, and record keeping. Prepared by Megapesca Lda. Dated: 11/3/2021
معلومة إضافية
حقل | قيمة |
---|---|
أخر تحديث | October 7, 2022 |
أنشئت | October 7, 2022 |
شكل | application/pdf |
ترخيص | Creative Commons Attribution |
نوع | Presentation |
Sector | Socioeconomic |
Category | N/A |
Habitat | N/A |
Species group | N/A |
Economic group | All |
Publication/creation date | 03/11/2022 |
Last update date | 07/10/2022 |
الإصدار | 1.0 |
الحالة | Final |
مؤلف | Ian Goulding, Megapesca Lda – Portugal |
البريد الإلكتروني للمؤلف | Ian Goulding, Megapesca Lda – Portugal |
القائم بالصيانة | CRFM Communications |
البريد الإلكتروني ل مؤدي الصيانة | communications@crfm.int |
Owner | CRFM |
Owner email | secretariat@crfm.int |