Module 2 | Session 2: Water Quality and ...
The materials in this session cover water quality control activities, maintenance and calibration of production equipment, and water quality control activities. Areas covered are the purpose of assuring water quality as a prerequisite of the FSMS, chlorination procedures, chlorine testing, corrective actions and record keeping, maintenance and calibration of production equipment, procedure for calibrating thermometers and scales, and record keeping. Prepared by Megapesca Lda. Dated: 11/3/2021
Zusätzliche Informationen
Feld | Wert |
---|---|
Zuletzt aktualisiert | 7. Oktober 2022 |
Erstellt | 7. Oktober 2022 |
Format | application/pdf |
Lizenz | Creative Commons Attribution |
Typ | Presentation |
Sector | Socioeconomic |
Category | N/A |
Habitat | N/A |
Species group | N/A |
Economic group | All |
Publication/creation date | 03/11/2022 |
Last update date | 07/10/2022 |
Version | 1.0 |
Status | Final |
Autor | Ian Goulding, Megapesca Lda – Portugal |
E-Mail des Autors | Ian Goulding, Megapesca Lda – Portugal |
Verantwortlicher | CRFM Communications |
E-Mail des Verantwortlichen | communications@crfm.int |
Owner | CRFM |
Owner email | secretariat@crfm.int |